Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
WSDOT announced multiple highway closures affecting the Olympic Peninsula this weekNo usable supporting receipt β unverified.
- β
I-405 will have northbound lane closures from milepost 0 to 1.5 nightlyβ405: Up to two lanes of northbound I-405 from I-5 (milepost 0) to milepost 1.5 will be closed nightly, 9 p.m. Monday, Aug. 24 β 5 a.m. Wednesday, Aug. 26.β
- β
The northbound lane closures on I-405 will occur from 9 p.m. Monday to 5 a.m. Wednesdayβ405: Up to two lanes of northbound I-405 from I-5 (milepost 0) to milepost 1.5 will be closed nightly, 9 p.m. Monday, Aug. 24 β 5 a.m. Wednesday, Aug. 26.β
- β
The northbound lane closures on I-405 will take place on Aug. 24-26β405: Up to two lanes of northbound I-405 from I-5 (milepost 0) to milepost 1.5 will be closed nightly, 9 p.m. Monday, Aug. 24 β 5 a.m. Wednesday, Aug. 26.β
- β
A second I-405 northbound closure will occur from 11 p.m. FridayNo usable supporting receipt β unverified.
- β
The second I-405 northbound closure will happen on Aug. 28β405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31.β
- β
The second I-405 northbound closure will end on 4 a.m. Mondayβ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.β
- β
The second I-405 northbound closure will end on Aug. 31β405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.β
- β
SR 20 near Loup Loup Pass will experience pavement repairs with alternating one-lane trafficβ020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.β
- β
The alternating one-lane traffic on SR 20 will occur Mondays to Thursdaysβ020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.β
- β
The alternating one-lane traffic on SR 20 will take place from 6 a.m. to 8 p.m.β020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.β
- β
The pavement repairs on SR 20 will continue until Aug. 27β020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.β
- β
SR 9 near Kalloch Road will have single-lane traffic with alternating directionsβ009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- β
The single-lane traffic on SR 9 will go through a bypass roadβ009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- β
The fish passage construction on SR 9 will continue until Sept. 14β009: SR 9 is reduced to a single lane near Kalloch Road (MP 59) with a signal alternating northbound and southbound traffic through a bypass road for 42 days, until Sept. 14 for fish passage construction. Expect delays in the area.β
- β
SR 211 will have a single lane closure from 6:35 a.m. to 8 p.m.β211: Lane Closure on SR 211 both directions at milepost Marker 13 to milepost 15 paving beginning at 6:35 am on August 25, 2026, until 8pm. Expect delays
Effective: Aug 25, 2026, 6:35 AM
Expected end: Aug 25, 2026, 8:00 PMβ
- β
The single lane closure on SR 211 will occur on Aug. 25β211: Lane Closure on SR 211 both directions at milepost Marker 13 to milepost 15 paving beginning at 6:35 am on August 25, 2026, until 8pm.β