← The Peninsula Wire
Infrastructure

SR 112 landslide repair work underway

πŸ”Š Listen Β· narrated by Aiden

Travelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu. The speed limit is reduced to 25 mph from milepost 15.75 to milepost 16.05. The project webpage provides more information on the landslide repair work.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 112 landslide repair work underwayβ€œTravelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu. The speed limit is reduced to 25 mph from milepost 15.75 to milepost 16.05. Find out more about this landslide repair work on the project webpage.”
  • βœ“
    Temporary traffic lights and reduced speed limit on SR 112 between Clallam Bay and Sekiu from Aug 13 to Nov 21, 2026.β€œTravelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu. The speed limit is reduced to 25 mph from milepost 15.75 to milepost 16.05. Find out more about this landslide repair work on the project webpage. Effective: Aug 13, 2026, 8:59 AM Expected end: Nov 21, 2026, 6:00 AM”
  • βœ“
    Travelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu. The speed limit is reduced to 25 mph from milepost 15.75 to milepost 16.05. The project webpage provides more information on the landslide repair work.β€œTravelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu.”
Source text saved for this check (2026-10-27T06:59:11.717Z)
WSDOT highway construction and road closures within 50 miles of Olympic Peninsula β€” 10/26/2026:

112 [40 mi from Olympic Peninsula]: Travelers will see temporary traffic lights and single-lane alternating traffic around the clock on SR 112 between Clallam Bay and Sekiu. The speed limit is reduced to 25 mph from milepost 15.75 to milepost 16.05. Find out more about this landslide repair work on the project webpage.
Effective: Aug 13, 2026, 8:59 AM
Expected end: Nov 21, 2026, 6:00 AM

101 [44 mi from Olympic Peninsula]: Travelers should expect one-way alternating traffic controlled by a signal 24 hours a day on US 101 at the Hoh River Bridge.
Effective: Sep 2, 2026, 2:26 PM
Expected end: Sep 15, 2028, 2:45 PM

020 [44 mi from Olympic Peninsula]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.

Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM

The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.