The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.
Construction of a new roundabout at the intersection will resume in spring 2027.
The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.
Construction of a new roundabout at the intersection will resume in spring 2027.
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
WSDOT highway construction and road closures within 50 miles of Olympic Peninsula β 10/23/2026: 020 [44 mi from Olympic Peninsula]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed. Construction of a new roundabout at the intersection will resume in spring 2027. Effective: Sep 4, 2026, 8:25 AM 101 [46 mi from Olympic Peninsula]: Expect daytime single-lane alternating traffic on US 101 at the Jefferson-Clallam county line. The speed limit is reduced to 25 mph between mileposts 184 and 185. Read more about this fish passage work on the project webpage. Effective: Feb 29, 2024, 11:18 AM Expected end: Dec 31, 2026, 11:18 AM
The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.