Northbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work. The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.
SR 525 construction alternates traffic Oct. 15-16
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βSR 525 construction alternates traffic Oct. 15-16βNorthbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work.β
- βWSDOT will alternate northbound and southbound traffic on SR 525 near Admiral Drive for utility work from 9 p.m. Thursday to 5 a.m. Friday.βNorthbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work.β
- βNorthbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work. The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.βNorthbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work.β
Source text saved for this check (2026-10-15T19:02:03.277Z)
WSDOT highway construction and road closures within 50 miles of Olympic Peninsula β 10/15/2026: 525 [38 mi from Olympic Peninsula]: Northbound and southbound SR 525 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Admiral Drive (milepost 30) for utility work. Effective: Oct 12, 2026, 8:07 AM Expected end: Oct 16, 2026, 5:00 AM 101 [44 mi from Olympic Peninsula]: From 9 a.m. to noon, Thursday, Oct. 15, travelers will see traffic holds of up to 20 minutes at a time as crews put down striping on the US 101 Hoh River Bridge. Travelers will also need to prepare for overnight closures at the Hoh River Bridge. The bridge will close at 7 p.m. each night Tuesday, Oct. 13 through Sunday, Oct. 18 and reopen at 5:30 a.m. each following morning. Effective: Sep 2, 2026, 2:26 PM Expected end: Sep 15, 2028, 2:45 PM 020 [44 mi from Olympic Peninsula]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed. Construction of a new roundabout at the intersection will resume in spring 2027. Effective: Sep 4, 2026, 8:25 AM 101 [47 mi from Olympic Peninsula]: Expect temporary traffic lights and single-lane alternating traffic through fall on US 101 near Mansfield Road. The speed limit is reduced from 55 mph to 25 mph from milepost 189.14 to milepost 189.55. Work is for a fish passage project. Get more details on the project webpage. Effective: Mar 18, 2025, 2:47 PM Expected end: Dec 31, 2026, 6:00 PM
The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.