← The Peninsula Wire
Infrastructure

SR 525, US 101 Hoh Bridge, SR 20 Closures Continue

πŸ”Š Listen Β· narrated by Aiden

State Route 525 will alternate traffic with flaggers near Admiral Drive (milepost 29) daily from 9 a.m. to 2:30 p.m. through Thursday, Sept. 17, for utilities work.

The US 101 Hoh River Bridge will close nightly from 10:30 p.m. to 5:30 a.m. from Monday, Sept. 14 to Tuesday, Sept. 22 for emergency repairs, with the project extending until July 14, 2027.

A temporary 40 mph speed limit on SR 20 near Campbell Lake Road (mileposts 45. 48 to 46. 62) will remain in place through a six-month settlement period, with a new roundabout scheduled for spring 2027.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 11 claims supported Β· 73%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    State Route 525 will alternate traffic with flaggers near Admiral Drive (milepost 29) dailyβ€œ525 [38 mi from Olympic Peninsula]: Daily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    The traffic alternation on State Route 525 will occur from 9 a.m. to 2:30 p.m.β€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    The traffic alternation on State Route 525 will take place through Thursday, Sept. 17β€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ—
    The US 101 Hoh River Bridge will close nightly from 10:30 p.m. to 5:32 a.m.β€œTravelers will need to prepare for overnight and around-the-clock closures at the US 101 Hoh River Bridge. From Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.”
  • βœ“
    The closure of the US 101 Hoh River Bridge will start on Monday, Sept. 14β€œFrom Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.”
  • βœ—
    The closure of the US 101 Hoh River Bridge will end on Tuesday, Sept. 22β€œEffective: Sep 2, 2026, 2:26 PM Expected end: Jul 14, 2027, 2:45 PM”
  • βœ“
    The US 101 Hoh River Bridge closure is for emergency repairsβ€œTravelers will need to prepare for overnight and around-the-clock closures at the US 101 Hoh River Bridge. From Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.”
  • βœ“
    The US 101 Hoh River Bridge project will extend until July 14, 2027β€œExpected end: Jul 14, 2027, 2:45 PM”
  • ⚠
    A temporary 40 mph speed limit on SR 20 near Campbell Lake Road (mileposts 45. 48 to 46. 62) will remain in placeNo usable supporting receipt β€” unverified.
  • βœ“
    The temporary 40 mph speed limit on SR 20 will remain in place through a six-month settlement periodβ€œThe temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.”
  • βœ“
    A new roundabout is scheduled for spring 2027 on SR 20 near Campbell Lake Roadβ€œConstruction of a <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-20-campbell-lake-road-intersection-improvements">new roundabout</a> at the intersection will resume in spring 2027.”

The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.