← The Peninsula Wire
Infrastructure

SR 525 work to end Sept. 17; SR 20 speed limit active

πŸ”Š Listen Β· narrated by Aiden

State Route 525 will have alternating traffic with flaggers near Admiral Drive (milepost 29) daily from 9 a.m. to 2:30 p.m., excluding weekends, through Thursday, Sept. 17, for utility work.

State Route 20 eastbound and westbound will maintain a 40 mph temporary speed limit near Campbell Lake Road (mileposts 45. 48 to 46. 62) through a six-month settlement period. An advisory 30 mph speed limit is posted through a curve where banking was removed. Construction of a new roundabout at the intersection will resume in spring 2027.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 8 claims supported Β· 100%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    State Route 525 will have alternating traffic with flaggers near Admiral Drive (milepost 29) dailyβ€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    The alternating traffic on State Route 525 will be from 9 a.m. to 2:30 p.m.β€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    The alternating traffic on State Route 525 will exclude weekendsβ€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    The alternating traffic on State Route 525 will continue through Thursday, Sept. 17β€œDaily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • βœ“
    State Route 20 eastbound and westbound will maintain a 40 mph temporary speed limit near Campbell Lake Road (mileposts 45. 48 to 46. 62)β€œThe temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.”
  • βœ“
    The 40 mph temporary speed limit on State Route 20 will last through a six-month settlement periodβ€œThe temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period.”
  • βœ“
    An advisory 30 mph speed limit is posted through a curve where banking was removedβ€œAn advisory speed of 30 mph is posted through a curve where banking was removed.”
  • βœ“
    Construction of a new roundabout at the intersection will resume in spring 2027β€œConstruction of a <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-20-campbell-lake-road-intersection-improvements">new roundabout</a> at the intersection will resume in spring 2027.”

The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.