← The Peninsula Wire
Infrastructure

US 101 Hoh River Bridge to Close for Emergency Repairs

πŸ”Š Listen Β· narrated by Aiden

The Washington State Department of Transportation (WSDOT) announced overnight closures for the US 101 Hoh River Bridge starting Sept. 14 through Sept. 22. Each night, the bridge will close from 10:30 p.m. to 5:30 a.m. for emergency repairs.

These closures affect travel on US 101 near the Hoh River. The project is expected to last until July 14, 2027. WSDOT states the repairs are necessary to address urgent structural concerns.

SR 20 will return to normal traffic flow after Sept. 4 when the Campbell Lake Road intersection project ends. A separate SR 20 work zone from Swin Slough Bridge to Laconner Whitney Road will continue daily until further notice.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts9 of 10 claims supported Β· 90%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    The Washington State Department of Transportation (WSDOT) announced overnight closures for the US 101 Hoh River Bridgeβ€œTravelers will need to prepare for overnight and around-the-clock closures at the US 101 Hoh River Bridge. From Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for emergency repairs.”
  • βœ“
    The overnight closures for the US 101 Hoh River Bridge start on Sept. 14β€œFrom Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for emergency repairs.”
  • βœ“
    The overnight closures for the US 101 Hoh River Bridge end on Sept. 22β€œFrom Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.”
  • βœ“
    Each night, the US 101 Hoh River Bridge will close from 10:30 p.m. to 5:30 a.m.β€œFrom Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.”
  • βœ“
    The closures affect travel on US 101 near the Hoh Riverβ€œTravelers will need to prepare for overnight and around-the-clock closures at the US 101 Hoh River Bridge. From Monday, Sept. 14 to Tuesday, Sept. 22, each night from 10:30 p.m. to 5:30 a.m., the US 101 Hoh River Bridge will close to all traffic for emergency repairs.”
  • βœ“
    The project is expected to last until July 14, 2027β€œExpected end: Jul 14, 2027, 2:45 PM”
  • ⚠
    WSDOT states the repairs are necessary to address urgent structural concernsNo usable supporting receipt β€” unverified.
  • βœ“
    SR 20 will return to normal traffic flow after Sept. 4β€œ020 [44 mi from Olympic Peninsula]: SR 20 will be reduced to a single lane until Sept. 4 with a temporary signal and flaggers alternating traffic through a three-way intersection at Campbell Lake Road (milepost 46) around the clock to level ground in preparation for a roundabout. Expect significant delays, especially during busy travel times.”
  • βœ“
    The Campbell Lake Road intersection project ends on Sept. 4β€œ020 [44 mi from Olympic Peninsula]: SR 20 will be reduced to a single lane until Sept. 4 with a temporary signal and flaggers alternating traffic through a three-way intersection at Campbell Lake Road (milepost 46) around the clock to level ground in preparation for a roundabout. Expect significant delays, especially during busy travel times. More information on <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-20-campbell-lake-road-intersection-improvements">project webpage</a>. Effective: Aug 13, 2026, 9:51 AM Expected end: Sep 4, 2026, 6:00 PM”
  • βœ“
    A separate SR 20 work zone from Swin Slough Bridge to Laconner Whitney Road will continue daily until further noticeβ€œ020 [48 mi from Olympic Peninsula]: Daily (except Saturday, Sunday) beginning Aug. 21 until further notice: State Route 20 traffic will alternate with flaggers from the Swin Slough Bridge (milepost 50) to Laconner Whitney Road/Bay View Road (milepost 53) for city Anacortes utilities work.”

The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.