US 101 will close at milepost 177 across the Hoh River Bridge beginning at 5:00 am on October 1, 2026, until about 12:00 pm on October 6, 2026. Road is closed with no detours available. The closure is for emergency repairs on the Hoh River Bridge, with the work scheduled to last until noon on Tuesday, October 6, 2026.
US 101 Hoh River Bridge to Close for Emergency Repairs
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βUS 101 Hoh River Bridge to Close for Emergency Repairsβ101 [44 mi from Olympic Peninsula]: Travelers will need to prepare for around-the-clock closures at the US 101 Hoh River Bridge. From 5 a.m. Thursday, Oct. 1 to noon Tuesday, Oct. 6, the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>.β
- βUS 101 Hoh River Bridge will close to all traffic from Oct. 1 to Oct. 6 for emergency repairs, with no detours available.β101 [44 mi from Olympic Peninsula]: Closure on US 101 in both directions at milepost 177, across the Hoh River Bridge beginning at 5:00 am on October 1, 2026 until about 12:00 pm on October 6, 2026. Road is closed. There are no detours available.β
- βUS 101 will close at milepost 177 across the Hoh River Bridge beginning at 5:00 am on October 1, 2026, until about 12:00 pm on October 6, 2026. Road is closed with no detours available. The closure is for emergency repairs on the Hoh River Bridge, with the work scheduled to last until noon on Tuesday, October 6, 2026.β101 [44 mi from Olympic Peninsula]: Closure on US 101 in both directions at milepost 177, across the Hoh River Bridge beginning at 5:00 am on October 1, 2026 until about 12:00 pm on October 6, 2026. Road is closed. There are no detours available.β
Source text saved for this check (2026-10-04T19:00:09.473Z)
WSDOT highway construction and road closures within 50 miles of Olympic Peninsula β 10/4/2026: 101 [44 mi from Olympic Peninsula]: Closure on US 101 in both directions at milepost 177, across the Hoh River Bridge beginning at 5:00 am on October 1, 2026 until about 12:00 pm on October 6, 2026. Road is closed. There are no detours available. Effective: Oct 1, 2026, 5:00 AM Expected end: Oct 6, 2026, 12:00 PM 101 [44 mi from Olympic Peninsula]: Travelers will need to prepare for around-the-clock closures at the US 101 Hoh River Bridge. From 5 a.m. Thursday, Oct. 1 to noon Tuesday, Oct. 6, the US 101 Hoh River Bridge will close to all traffic for <a href="https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair">emergency repairs</a>. Effective: Sep 2, 2026, 2:26 PM Expected end: Jul 14, 2027, 2:45 PM 020 [44 mi from Olympic Peninsula]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed. Construction of a <a href="https://wsdot.wa.gov/construction-planning/search-projects/sr-20-campbell-lake-road-intersection-improvements">new roundabout</a> at the intersection will resume in spring 2027. Effective: Sep 4, 2026, 8:25 AM
The Peninsula Wire is free. Get Olympic Peninsula's news delivered every morning.